Climbing on Power Pole

Our Work

We at DMB Engineering understand the changing complexities of business and we can deliver projects independently or as a Partnership or Joint Venture. We can provide you with: Project Management; Estimating; Cost Analysis; Project Budgets; Procurement and Labour so your project has the right advice to achieve maximum results.

DMB Engineering has the depth of experience and financial capacity to undertake major projects throughout Australia. We look forward to meeting with you to discuss how together we can exceed your expectations and deliver your project on time and within budget.
 

HAUGHTON SOLAR FARM

SYNCHRONOUS CONDENSER

PROJECT

ABB HITACHI POWER GRIDS 2021 ($1M - $2M)

The Haughton Synchronous Condenser Project involved the installation of a new Synchronous Condenser, Pony Motor and Flywheel Unit designed to improve the energy production and efficiency of the Haughton Solar Farm Substation without increasing coal consumption or overall emissions.

  • Installation and Alignment of Synchronous Condenser

  • Installation and Alignment of Pony Motor and Flywheel 

  • Grouting and Foundation Setting 

  • Lube Oil Supply and Flushing

  • Pipework Assembly and Pressure Testing

  • Cable Laying and Terminations

  • Cooling System Installation

  • Site External Earthing

  • QA and Documentation

  • Pre-Commissioning, Testing and Handover

2 0 2 1

ROBERTSTOWN

SYNCHRONOUS CONDENSER

PROJECT

SIEMENS ENERGY 2020 - 2021 ($4M - $5M)

The purpose of extending the existing Robertstown Substation was to provide 275 kV transmission network connection points in the form of two 129 MVA Synchronous Condenser Units. These units were installed in conjunction with Pony Motor, Fly wheel, IPB and other control/protection related units.

 

  • Installation and Alignment of Synchronous Condenser

  • Installation and Alignment of Pony Motor and Flywheel 

  • Installation of Marshalling Busbar Connection Points

  • Synchronous Building Cable Ladder Installation and Routing

  • Installation of Steel Structures and Isolated Phase Bus Duct (IPB)

  • AC/DC Cubicle Installations

  • Cable laying and Terminations

  • Cooling System Installation

  • Grouting and Foundation Setting

  • Pre-Commissioning, Testing and Handover

2 0 2 1

BAYSWATER POWER STATION 

DCS UPGRADE PROJECT

UNIT 2 & 3

SIEMENS ENERGY 2020 - 2022 ($3M - $5M)

Siemens in conjunction with AGL worked on completing the Bayswater Power Station upgrade associated with Unit 2 & 3. The Bayswater upgrade was designed to improve the power station’s capacity and efficiency resultantly increasing electricity supply without increasing coal consumption or emissions.

 

  • Site Inspection and Project Managmnet

  • Sensor Bracket Design, Fabrication, and Installation

  • Installation and Routing of Cable Ladder

  • Removal of Redundant Cables & Cubicles

  • Switchgear and Protection Panel Modifications

  • Gearplate Modifications and Installations

  • AC/DC Panel and Cubicle Installations

  • Cable Laying and Terminations

  • QA and Documentation

  • Pre-Commissioning, Testing and Handover Ahead of Schedule

2 0 2 0 - 2 0 2 2

PENNANT HILLS

NORTH CONNEX TUNNEL

PROJECT

LEND LEASE BOUYGUES JOINT VENTURE 2019 ($2M - $4M) 

The NSW and Federal Governments, Transurban and the M7 Westlink Shareholders (the Project Sponsors) came together to build, operate and maintain the tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills known as NorthConnex. The nine kilometre tunnel motorway includes interchanges to the north and south to accommodate connections at either end of the project. 

 

  • Firestop Installation

  • HV Cabinet Equipment Installation

  • Cable Ladder Installation and Routing

  • Confined Space Cable Laying

  • Installation of Communication and Control Equipment 

  • Jet Fan Installation

  • Cable Laying and Terminations

  • QA and Documentation

  • Pre-Commissioning, Testing and Handover

2 0 1 9

HAUGHTON SOLAR FARM

HV SUBSTATION INSTALLATION

PROJECT

RCR INFRASTRUCTURE 2018 ($5M - $10M) 

The scope of work for the Haughton Solar Farm HV Substation involved the installation of HV Substation Equipment and included testing and pre-commissioning. The work also involved the installation of overhead conductors, trenching and back filling, termination of cables, the installation of interconnections to solid busbars and Independent Earth Switches and more.

  • Installation of Structural Steel including Overhead Gantry Structures and Lighting/Lightning Towers

  • Installation of 275kV Circuit Breakers, Busbars, Voltage/Current Transformers and Surge Arrestors

  • Installation of Lightning Masts

  • Earthing Cable Compression Crimping

  • Cable Laying and Terminations

  • Installation of Cable Way Routing 

  • Site Inspection and Project Management 

  • QA and Documentation

  • Pre-Commissioning, Testing and Handover

2 0 1 8

Completed Projects

M O R E

Queensland

  • Gold Coast Light Rail Stage 2 Project – CPB Contractors ($4M - 2017)

  • Legacy Way Tunnel (ITS) Contract - Transcity & Schneider Electric         ($16.5M - 2013)

  • Gold Coast Tugun Bypass Tunnel Project – Abigroup ($10M - 2006)

  • Clem 7 & Airport Link Tunnels – UGL/TJH                           ($1M - 2012)

  • Alligator Creek – SVC Project – Siemens/Powerlink         ($4M - 2009)

  • Gold Coast – Tugun Desalination Project – John Holland                                 ($1M - 2011)

  • Greenbank/Southpine – SVC Projects – Siemens/Powerlink ($3M - 2012)

  • Rugby Run Solar Farm – Adani Renewables                         ($1M - 2018)

  • Haughton Solar Farm – RCR O’Donnell Griffin               ($1M - 2019)

  • Haughton Solar Farm Synchronous Condenser – ABB Hitachi Power Grids  ($2M - 2021)

  • Blackwater SVC’s – Siemens & Powerlink                             ($4M - 2012)

  • Miles – Condamine Power Station Project – AEE     ($3.5M - 2009)

New SOUTH WALES

  • Westconnex M4 Widening Project – Visionstream & Rizzani CPB Joint Venture ($2M - 2016)

  • Westconnex M4 Tunnel Project – ECM & CPB Samsung Joint Venture      ($1M - 2018)

  • AGL Bayswater DCS Upgrade (Unit 4) – SIEMENS            ($2M - 2019)

  • NorthConnex Project – Lendlease Bouygues Joint Venture                               ($5M - 2019)

  • AGL Bayswater DCS Upgrade (Unit 2 & 3) – SIEMENS    ($4.5M - 2020 - 2022)

Western Australia

  • South Headland 220/33kV substation – Alstom Grid/Horizon Power          ($5M - 2014)

  • Tom Price 220/33kV Substation - ABB/RioTinto ($4M - 2011)

  • Cape Lambert 220/132/33kV GIS Supply Substation - ABB/Rio Tinto                 ($2.5M - 2012)

  • Marandoo 220/33kV Substation – ABB/Rio Tinto ($3.5M - 2013)

  • Juna Downs 220kV Expansion Project & SVC Install – ABB/Rio Tinto                 ($3.5M - 2011)

  • Bulgarra& Pegs Creek 132-22kV Substations – ABB/Horizon Power        ($2.5M - 2010) 

  • 7 Mile Power Station 220kV Switchyard Project – ABB/RioTinto                     ($4M - 2015)

  • Brockman 4 220/33/11kV Bulk Supply Substation – ABB/Rio Tinto                                 ($3.5M - 2009)

South Australia

  • Robertstown Substation Synchronous Condenser – Siemens Energy                 ($5M - 2021)